Heavy Mechanical

Structural Repair & Fabrication

Crack repair, wear-plate renewal, bucket and body rebuilds, and fabricated equipment built to drawing.

Request a quotationWorkshop and on site
Overview

What the work involves

Structures on mining plant crack. Booms, chassis, bins and buckets carry cyclic loads their whole life, and the repair matters as much as the weld. Cracks are ground out, prepared, welded to a documented procedure and, where the load path warrants it, reinforced rather than simply filled.

Wear management is the other half: liner and wear-plate renewal on buckets, bins and chutes, with the plate specified to the abrasion actually seen rather than to whatever is in stock.

The fabrication bay also builds to drawing — diesel bowsers, service bodies, skids, stands and site equipment — with materials certified and welds carried out by coded welders.

At a glance
Division
Heavy Mechanical
Availability
Workshop and on site
Method steps
4
Sectors served
5
Base
Middelburg
Get a quotation
What you get

What this actually changes for your operation

Repairs to a written procedure

Preparation, consumable, pass sequence and pre-heat are specified per repair rather than left to the welder on the day.

Reinforced where the load says so

A crack that keeps returning is a design problem. Where the load path warrants it, we reinforce instead of re-welding the same seam.

Wear plate matched to the duty

Plate grade is specified to the abrasion actually seen on your material, which is what makes a liner last its intended life.

Built to drawing, certified

Fabricated equipment is built to drawing with material certificates and coded welders, and handed over with the documentation.

Method

How the work runs, step by step

Every stage has an output you can see. Nothing moves to the next step until the previous one is signed.
  1. 01

    Inspection and crack detection

    1 day

    Affected area cleaned and inspected, with dye-penetrant or magnetic-particle testing to establish the true extent.

  2. 02

    Repair procedure

    1–2 days

    Preparation, consumable, pre-heat and pass sequence specified in writing before any arc is struck.

  3. 03

    Execution

    Per scope

    Crack ground out and welded to procedure by coded welders, with reinforcement added where the load path requires it.

  4. 04

    Verification and finish

    1–2 days

    Repair re-tested, dressed, primed and painted, with the procedure and test results handed over.

Plant & equipment

What we bring to it

MIG, MMA and gouging plant

Structural welding and carbon-arc preparation

Plate rolling and cutting

Profile cutting and forming for liners and bodies

Overhead lifting

Rated handling of bodies, buckets and fabricated assemblies

NDT equipment

Dye-penetrant and magnetic-particle crack detection

Pre-heat equipment

Controlled pre-heat and interpass temperature on heavy sections

Safety controls

What is in place before work starts

Hot work permits, fire watch and gas testing before any cutting or welding

Fume extraction and respiratory protection in the fabrication bays

Structures supported and cribbed before load-bearing members are cut

Confined-space controls where work is inside a bin, tank or body

On the job

This service, photographed on site

A shrink-wrapped pallet of parts lifted by forklift ready for dispatch to site
A rebuilt final drive assembly painted yellow, lifted on slings outside the workshop
See the full gallery

Need structural repair & fabrication?

Send the scope, the machine or the volume. You will get a straight answer on whether we can do it, when, and what it costs.

Breakdowns are answered 24 hours a day, every day of the year.