Heavy Mechanical

Hydraulic Systems, Cylinders & Hose

Cylinder re-lining, pump and valve bank overhaul, and hose assemblies crimped on site or in the workshop.

Request a quotationWorkshop and 24-hour mobile
Overview

What the work involves

Most hydraulic call-outs are not a failed pump. They are a hose that chafed through, a seal that let go, or contamination that has been circulating for weeks. Fault-finding starts with pressure and flow readings, not with a parts order.

Cylinders are stripped, honed and re-lined where the bore allows, with new seal kits and rechromed or replaced rods. Pumps, motors and valve banks are overhauled and set to the correct standby and relief pressures.

Hose assemblies are crimped to SAE and EN specification, either at the workshop or from the mobile units on site, so a burst hose is measured, made and fitted in one visit rather than three.

At a glance
Division
Heavy Mechanical
Availability
Workshop and 24-hour mobile
Method steps
4
Sectors served
5
Base
Middelburg
Get a quotation
What you get

What this actually changes for your operation

Diagnosis before parts

Pressure and flow are measured first. You are not billed for a pump that was never the problem.

Hoses made on site

Mobile units carry hose, fittings and a crimper, so a burst line is measured, made and fitted in the same visit.

Contamination taken seriously

Systems are flushed and filtration addressed, because putting a clean component into a dirty system just buys another failure.

Pressures set and recorded

Standby, relief and pilot pressures are set to specification and written down, so the next technician has a baseline.

Method

How the work runs, step by step

Every stage has an output you can see. Nothing moves to the next step until the previous one is signed.
  1. 01

    Pressure and flow diagnosis

    Hours

    System is tested under load with gauges and flow meters to isolate the actual fault before anything is removed.

  2. 02

    Component removal and strip

    1–3 days

    Affected cylinder, pump, motor or valve bank is removed under controlled depressurisation and stripped for assessment.

  3. 03

    Overhaul

    3–10 days

    Bores honed, rods rechromed or replaced, seal kits renewed, valve spools and pump internals assessed and replaced as measured.

  4. 04

    Flush, refit and set

    1–2 days

    System flushed, filtration renewed, component refitted, and pressures set and recorded against specification.

Plant & equipment

What we bring to it

Hose crimping machines

Workshop and mobile crimpers to SAE and EN specification

Honing and cylinder benches

Cylinder strip, hone and reassembly

Pressure and flow test gear

Load testing and pressure setting on the machine

Filtration and flush units

System decontamination after a component failure

Seal and fitting stock

Common seal kits and fittings carried on the mobile units

Safety controls

What is in place before work starts

Systems depressurised and stored energy released before any line is broken

Fluid injection hazards briefed; no leak is ever traced by hand

Spill kits deployed at every break point and used oil captured for licensed disposal

Hot surfaces and pressurised accumulators isolated before work begins

On the job

This service, photographed on site

Close inspection of hydraulic hoses and a valve bank contaminated with dust and oil
A mobile field service team repairing a large Komatsu mining excavator on a coal stockpile under clear sky
See the full gallery

Need hydraulic systems, cylinders & hose?

Send the scope, the machine or the volume. You will get a straight answer on whether we can do it, when, and what it costs.

Breakdowns are answered 24 hours a day, every day of the year.