Earthmoving & Plant Hire

Plant Hire — Wet & Dry

Dozers, excavators, haulers and support plant on hire, with or without operators, mobilised on low-bed to your site.

Request a quotationShort-term, monthly and contract hire
Overview

What the work involves

Plant hire is the division the business is named for. Machines go out wet — with a competent, inducted operator and full maintenance carried by us — or dry, where your operators run the machine and we carry the major component risk.

Every unit leaves the yard on a signed condition report with hour meter, fluid levels, fire suppression and safety equipment recorded. It comes back the same way, so hire disputes are settled by a document rather than an argument.

Because the workshop is ours, a machine on hire is not waiting on a third party when something fails. The mobile units carry the parts that most often stop a machine, and the yard is inside the OEM corridor for everything else.

At a glance
Division
Earthmoving & Plant Hire
Availability
Short-term, monthly and contract hire
Method steps
5
Sectors served
5
Base
Middelburg
Get a quotation
What you get

What this actually changes for your operation

Wet hire with inducted operators

Operators arrive with medicals, competencies and inductions in order, so the machine is producing on day one instead of sitting at the gate.

Maintenance carried by us

On wet hire, servicing, component risk and breakdown response sit with Leikah. Your cost per hour is the rate, not the rate plus surprises.

Condition reports both ways

Signed off-hire and on-hire inspections with photographs remove the argument at the end of a contract.

Mobilisation handled end to end

Low-bed transport, abnormal-load arrangements and site delivery are ours to organise, not another vendor for you to chase.

Method

How the work runs, step by step

Every stage has an output you can see. Nothing moves to the next step until the previous one is signed.
  1. 01

    Requirement and availability

    Same day

    We confirm machine class, attachment, hours per month, haul profile and site access, then confirm availability against the fleet board.

  2. 02

    Rate and terms

    24–48 hours

    Written rate covering wet or dry, minimum hours, fuel basis, mobilisation and standing time. No verbal rates.

  3. 03

    Pre-delivery inspection

    1–2 days

    Machine is serviced, safety equipment checked, fire suppression certified, and a photographic condition report is issued before loading.

  4. 04

    Mobilisation and induction

    1–3 days

    Low-bed delivery to site, unloading under a lift plan where required, operator induction and hand-over signed on site.

  5. 05

    In-service support

    Duration of hire

    Scheduled services carried out on site to the hour meter, with breakdown response on the 24-hour line for the duration of the hire.

Plant & equipment

What we bring to it

Track-type tractors

D6 through D10 class, ripper-equipped where required

Tracked excavators

20 t to 75 t class, bucket or hammer

Articulated dump trucks

25 t to 40 t class

Motor graders

Haul road and platform work

Front-end loaders

Stockpile and load-out duty

Water bowsers and service trucks

Dust suppression and in-field servicing

Safety controls

What is in place before work starts

Operators supplied with current medicals, competency certificates and site inductions

Fire suppression and first-aid equipment certified before every dispatch

Lift plans for any offload requiring a crane or lifting equipment

Abnormal load permits and escorts arranged where the load requires them

Daily pre-use inspections recorded by the operator and countersigned by the site supervisor

On the job

This service, photographed on site

A Caterpillar dozer chained to a red lowbed trailer on a mine haul road under a wide sky
A Bell B40D articulated dump truck being delivered by lowbed into a rock quarry
A Liebherr R976 tracked excavator parked beside a service vehicle on a haul road
A Bell articulated dump truck loaded onto a lowbed trailer at golden hour
See the full gallery
Questions

What clients ask about this service

Wet hire means the machine comes with a competent, inducted operator, and servicing, maintenance and major component risk sit with us. Dry hire means your operators run the machine. Both are quoted with the fuel basis, minimum hours, mobilisation and standing time stated in writing.

Need plant hire — wet & dry?

Send the scope, the machine or the volume. You will get a straight answer on whether we can do it, when, and what it costs.

Breakdowns are answered 24 hours a day, every day of the year.