Skip to content
24-Hour Breakdown

Dewatering & Dust Suppression

Pump sets, lay-flat and water bowser circuits that keep the pit dry and the haul road visible.

Request a quotationContinuous, with monitored circuits
Overview

What the work involves

Water in the pit stops production and undermines the highwall. Dust on the haul road is a visibility hazard and, on most operations, a licence condition.

We install and run dewatering sets — pump, prime mover, lay-flat and discharge — sized to the inflow and the lift, with the discharge routed to the point your water management plan specifies. Sets are monitored and refuelled on a circuit, not left to run until someone notices they have stopped.

Dust suppression runs on a water bowser circuit with application rates set to the road, so surfaces stay bound without becoming slippery on gradient.

At a glance
Division
24-Hour Breakdown
Availability
Continuous, with monitored circuits
Method steps
4
Sectors served
4
Base
Middelburg
Get a quotation
What you get

What this actually changes for your operation

Sets sized to the actual inflow

Pump and prime mover are matched to inflow and lift, so the set keeps ahead of the water rather than falling behind it.

Monitored and refuelled on a circuit

Sets are checked and refuelled on a schedule, so you find out about a stopped pump from us, not from a flooded bench.

Discharge routed to plan

Discharge goes where your water management plan says it goes, with the routing documented for the environmental file.

Dust controlled without creating a slip

Application rates are set to the road and the gradient, keeping the fallout limit in hand without watering a ramp into a hazard.

Method

How the work runs, step by step

Every stage has an output you can see. Nothing moves to the next step until the previous one is signed.
  1. 01

    Assess inflow and lift

    1–2 days

    Inflow rate, static lift and discharge routing established so the set is sized correctly rather than by guess.

  2. 02

    Install and commission

    1–3 days

    Pump, prime mover, suction and lay-flat installed, discharge routed to plan, and the set commissioned and proved.

  3. 03

    Run and monitor

    Ongoing

    Sets checked, refuelled and serviced on a circuit, with running hours and volumes logged.

  4. 04

    Dust circuit

    Per shift

    Water bowsers run a set circuit at application rates matched to road surface and gradient.

Plant & equipment

What we bring to it

Diesel-driven pump sets

Tractor and skid-mounted units sized to inflow

Lay-flat and suction hose

Discharge routing across distance and lift

Water bowsers

16 000 L to 20 000 L dust suppression circuits

Fuel and service bowsers

In-field refuelling of running sets

Safety controls

What is in place before work starts

Pump sets bunded and sited clear of the water's edge with safe access maintained

Discharge lines secured and routed clear of traffic and pedestrian routes

Refuelling carried out with spill containment and no running engine

Water application controlled on gradient to avoid creating a slip hazard

On the job

This service, photographed on site

An articulated water bowser truck parked beside a service vehicle on a haul road
Two large tracked excavators positioned on a coal bench at an open-cast mine under heavy cloud
See the full gallery

Need dewatering & dust suppression?

Send the scope, the machine or the volume. You will get a straight answer on whether we can do it, when, and what it costs.

Breakdowns are answered 24 hours a day, every day of the year.