Skip to content
Earthmoving & Plant Hire

Haul Road Construction & Maintenance

Roads built and held to a standard that protects your tyre and suspension spend as much as your cycle times.

Request a quotationConstruction programmes and standing maintenance contracts
Overview

What the work involves

A haul road is the cheapest productivity gain on most sites and the most expensive thing to neglect. Rolling resistance costs fuel on every cycle, and a poor surface destroys tyres and struts long before their hours are up.

We build to a layer design — subgrade preparation, selected layer, wearing course — with cross-fall and drainage that actually sheds water rather than collecting it in the wheel path. Once built, roads are held: graded on a set frequency, watered to the dust limit, potholes and corrugation cut out before they spread.

The same crews build ramps, tip heads and workshop platforms, so the standard does not change when the work moves off the main haul route.

At a glance
Division
Earthmoving & Plant Hire
Availability
Construction programmes and standing maintenance contracts
Method steps
4
Sectors served
4
Base
Middelburg
Get a quotation
What you get

What this actually changes for your operation

Rolling resistance controlled

A maintained wearing course and correct cross-fall cut fuel burn and cycle time on every load that crosses it.

Tyre and strut life protected

Cutting rock out of the wheel path and holding the profile is the difference between a tyre reaching its hours and failing early.

Drainage designed in

Cross-fall, table drains and mitre drains are built with the road, not added after the first rain takes the surface off.

Dust suppressed to the limit

Water bowsers on a set circuit keep visibility and the dust fallout limit in hand without over-watering into a slip hazard.

Method

How the work runs, step by step

Every stage has an output you can see. Nothing moves to the next step until the previous one is signed.
  1. 01

    Route and layer design

    3–7 days

    Alignment, gradient, width and layer works are set against the largest vehicle on the route and the material available on site.

  2. 02

    Subgrade and layer works

    Per length

    Subgrade is proof-rolled, soft spots removed, and selected layers placed and compacted to the density specification.

  3. 03

    Wearing course and drainage

    Per length

    Wearing course placed to design thickness with cross-fall trimmed, table and mitre drains cut, and berms formed to the mine standard.

  4. 04

    Maintenance cycle

    Ongoing

    Grader and water bowser circuits run to an agreed frequency, with defects logged and cut out before they propagate.

Plant & equipment

What we bring to it

Motor graders

Blade trim, cross-fall and drain cutting

Water bowsers

16 000 L to 20 000 L for dust suppression circuits

Vibratory rollers

Smooth drum and padfoot for layer compaction

Tracked excavators

Drain excavation and berm forming

Articulated dump trucks

Layer material haul

Safety controls

What is in place before work starts

Berms maintained to half the tyre height of the largest vehicle on the route

Traffic accommodation and pilot vehicles wherever maintenance runs on a live haul route

Water application controlled to avoid creating a slip hazard on gradient

Night work only under adequate lighting with reflective delineation in place

On the job

This service, photographed on site

An articulated water bowser truck parked beside a service vehicle on a haul road
A freshly refurbished Caterpillar D10T dozer standing on rock at a mine site
Two large tracked excavators positioned on a coal bench at an open-cast mine under heavy cloud
See the full gallery

Need haul road construction & maintenance?

Send the scope, the machine or the volume. You will get a straight answer on whether we can do it, when, and what it costs.

Breakdowns are answered 24 hours a day, every day of the year.