Load-out, rehandle, stockpile construction and tip-head management kept clear of the production fleet.

Request a quotationShift-based and contract
Overview

What the work involves

Material that is stockpiled badly costs twice — once to build the pile and again to rehandle it. We build stockpiles to a shape that drains, stays stable and can be reclaimed without a machine working under an unsupported face.

Load-out crews work to your despatch schedule, with weighbridge tickets reconciled daily. Tip heads are kept trimmed and bermed so haulers can turn and tip without a spotter having to improvise.

Where material is contaminated or segregated by grade, the sequence is planned so grades do not mix in the pile — the cheapest quality control there is.

At a glance
Division
Earthmoving & Plant Hire
Availability
Shift-based and contract
Method steps
4
Sectors served
4
Base
Middelburg
Get a quotation
What you get

What this actually changes for your operation

Rehandle designed out

Stockpiles are placed and shaped for the way the material will be reclaimed, which removes a whole handling step from the cost.

Grades kept separate

Sequencing and pad layout stop grades contaminating each other, protecting the product before it reaches the plant.

Tip heads kept safe

Trimmed, bermed and lit tip heads let haulers cycle without hesitation, which is both a safety and a throughput gain.

Despatch reconciled daily

Weighbridge tickets and loader counts are reconciled every day, not at month end when nobody can reconstruct the difference.

Method

How the work runs, step by step

Every stage has an output you can see. Nothing moves to the next step until the previous one is signed.
  1. 01

    Pad and stockpile layout

    2–4 days

    Pads are set out for drainage, stability and reclaim access, with grade separation planned in from the start.

  2. 02

    Build sequence

    Ongoing

    Material is placed in lifts that keep the face reclaimable and the pile stable, with tip heads bermed and trimmed as they advance.

  3. 03

    Load-out and despatch

    Per schedule

    Loaders and excavators work to the despatch schedule, with tickets reconciled against loader counts daily.

  4. 04

    Stock reconciliation

    Monthly

    Monthly survey of stockpile volumes against system stock, with variances investigated rather than absorbed.

On the tools

The repair, as it happens

Short clips with no sound. Photographs show what came out the other end; these show the work itself.
  • Load-out from the coal floorProduct loaded off the floor for despatch, with the grade kept separate from the point it is dug.
Plant & equipment

What we bring to it

Front-end loaders

Load-out and pile shaping

Tracked excavators

Reclaim and selective handling

Articulated dump trucks

Rehandle and tip-head feed

Track-type tractors

Pile trimming and pad preparation

Safety controls

What is in place before work starts

No machine works under an unsupported or over-steepened stockpile face

Tip heads bermed to the mine standard and inspected before every shift

Spotters and radio protocols wherever loaders and haulers share a load-out area

Dust suppression maintained across load-out and tipping points

On the job

This service, photographed on site

Two hands holding a large layered slab of black coal, with the opencast pit and working machines behind
A piece of coal resting on the worn tooth of an excavator bucket, with a site vehicle out of focus behind it
A hand holding a slab of coal up against the pit behind it, with an excavator working in the background
Two large tracked excavators positioned on a coal bench at an open-cast mine under heavy cloud
See the full gallery

Need bulk materials handling & stockpiling?

Send the scope, the machine or the volume. You will get a straight answer on whether we can do it, when, and what it costs.

Breakdowns are answered 24 hours a day, every day of the year.